2018 new designed nail polish exhibition booth for nail enamel display
1.details of nail polish exhibition booth
- item name :nail polish exhibition booth
- size :customized
- basic material : MDF+baking paint
- surface finish : painting
- kickplate : 100mm s.s kickplate
- glass : 8mm thickness tempered glass
- color : customized
- logo :hollow acrylic logo
- feature : high end and beautiful
- application :display nail enamel,nail polish
- design time : 2-4 working days
- production time : 20-23 working days after payment
- shipping : about 30 days , depends on which port .
2.Our advantages:
Why choose our nail polish exhibition booth?
Environmental level: E1
FireLevel: B1
Wires for different countries different authentication name.
Australia: SAA, America: UL, Canada: CSA, Europe: CE
3.the real production photos for your reference
4.How to start a nail polish exhibition booth business?
frist step:meet will mall
Second step:mall send kiosk criteria
Third step:make 3D design according to mall criteria and send mall for approved(ususally need one week)
Fourth step:make tech drawings send mall to approval(usually need one week when everything goes well)
Fifth step:pay deposit and arrange production(25-30 work days)
Sixth step:shipping to kiosk to your destination(according to your post,leave one month will be better)
finally step:kiosk installation and opening(one week)
5.Easy Assemble and Disassemble
• The assembly steps are scientifically optimized
• Install Instruction are provided
• Spare parts are standardized
• Due to above conditions, the system can be easy installed, uninstalled, cleaned and displaced
6.Packing and shipping
- Cleaning and check nail polish exhibition booth
- packing with foam and plastic film
- packing in MDF wooden boxes
- put mark on package
- shipping
7.delivery of nail polish exhibition booth
How long can you receive kiosk after ordering?
Total delivery = Kiosk design progress + Kiosk manufacture time + shipping time to port + delivery time from port to mall .
Kiosk design progress: 7-10 days .
Kiosk building time: 15-18 work days .
shipping time to port : 15-18 days .
delivery time from port to mall :5-7 days .
8.Contact Jessy